Installation Guide

Note: Complete these remaining steps after the fixture
is hung.
14. Secure threaded nipple (P) to bushing(M) of housing
and screw hex nut (N).
15. Place cap (O) over the threade nipple (P).
16. Screw finial (Q) to threaded nipple (P). (N).
17. Install the light bulbs in accordance with the fixture's
specifications.
(DO NOT EXCEED MAXIMUM WATTAGE RATING)
Fig 4
For Customer Service, contact the place of purchase to arran
g
e for replacement parts.
PARTS & ASSEMBLY SHEET
Fixture Name: Echelon 8981-SF BRI / GRM
ASSEMBLING THE FIXTURE as Chain hung (Fig.3)
6. Remove the Circular strap from top of Fixture and
replace the long mounting screws with two short screws to
hold the Deco nuts (R) in place on the fixture Top cap (B).
7. Feed the fixture wires through the Top loop (A) and
pull the wires until taut. Then screw the Top LoopA to
the coupling on the Top cap (B) until tight.
8. By measuring determine correct number of links
needed for proper hanging height. Use a pair of pliers to
open one link of the Chain (A2) then remove the excess
Chain (A2) and discard it.
9. Use one chain connector(A12) to attach one end of the
chain to the Top loop (A) and close the chain connector.
10. Feed the fixture wires through the Chain (every three
links) and pull the wires until taut.
11. Slip Canopy loop collar (A11) over the chain, then do
the same with the canopy .
Fig 3
* NOTE: The Finial can be scratched or broken if the full
weight of the fixture is placed on it. To avoid damage
attach the Bottom Assembly parts after hanging the
fixture.
4.Slide the center support of the Fabric shade(I) over
center tube to the housing, it is open on one side for ease
of assembly. Secure in place by tightening Cap nut (J) to
Frame (K) with frame of shade between them (I).
5. Hang 3 crystal draping chain (G) to hook (H) of shade.
* You may now install the fixture as semi-flush.
Fig 2
12. When ready to complete the installation Use the other
chain connector and attach the other end of the chain to
the canopy loop (A10) and close the chain connector.
13. Make sure the weight of the chandelier is supported by
the chain-not the electrical wire.
* You may now install the fixture.