Installation Guide

Assembly Instructions: 4309-FM (Mercer)
IMPORTANT:
• ALL INSTALLATION WORK SHOULD BE DONE BY ACCREDITED PROFESSIONAL.
• SHUT OFF POWER SUPPLY AT FUSE OR CIRCUIT BREAKER!
• USE ONLY THE SPECIFIED BULBS. DO NOT EXCEED THE MAXIMUM WATTAGE!
PREPARING FOR INSTALLATION
Carefully remove all of the contents from the carton. See
the important notes above. Shut o the power at the circuit
breaker and completely remove the old xture from the
ceiling, including the old mounting strap.
From the parts bag remove the mounting strap assembly.
Mounting strap (B) contains threaded holes. Two of mounting
screws (A) should be attached to mounting strap (B). You may
need to tighten nuts (C) that hold these screws in place. Place
mounting strap (B) over the junction box so that mounting
screws (A) are vertical, and in alignment with the locations
of the holes ceiling pan (G). Secure mounting strap (B) to the
junction box with mounting screws (D) and a screwdriver.
Tighten the screws securely.
CONNECTING THE WIRES
Wrap or cut away any excess wires adding at least 2 to 3
inches of wire to the desired length. Attach the xture’s wires
to the power supply wires from the junction box. Connect
black to black (or smooth); white to white (or ribbed); ground
to ground (green or copper). Twist the ends of the wire pairs
together, and then twist on a wire connector. Make sure all
twists are in the same direction. If there is no ground wire
(green or copper) from the junction box, locate ground screw
(E) on mounting strap (B) and wrap the xtures ground wire
around the green ground screw (E). Use a screwdriver to
secure ground screw (E) onto the mounting bracket. Tuck all
wires neatly into the junction box.
CLEANING TIPS
Treat the xture gently! Regular cleaning will reduce the need for deep cleaning. For regular cleaning, turn o the light and wipe down the
xture with a clean lint-free cotton or microber cloth. Never spray cleaner directly onto the xture.
For Customer Service, contact
the place of purchase.
FINISHING THE INSTALLATION
Lift ceiling pan (G) up to the ceiling and position the ceiling
pan so that mounting screws (A) protrude through the holes
in the ceiling pan. Tightly thread nuts (F) onto the exposed
threads of mounting screws (A).
Install light bulbs (not provided) in accordance with the
xture’s specications. Do not exceed the maximum wattage.
Raise glass shade (J) up and over coupler (H) which is at the
center of the ceiling pan. Secure the glass in place with top
cap (K) and bottom nial (L). Twist tightly.
Your installation is now complete. Turn on the power and test
the xture.
A
B
C
E
D
G
F
H
I
J
K
L

Summary of content (1 pages)