SKU:WF297849
Before beginning installation, check local building codes reg arding footings, location and other requirements. Study and understand this instruction. Important information and helpful tips will make your installation easier and more enjoyable. There are some basic tools and materi als you will need for the installation. Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need.
GC M3 M3 GC M4 P3 P1 P1 (GC) P2 (M4) M4 GC (M3) (GC) (M3) M3 (P2) (P1) M3 GC (P1) (M3) S4 (P3) (GC) (M3) (S3) (M4) S3 (GC) (L1) S2 (L3) (S2) L3 (S4) L2 (UP1) UP1 L1 (L2) (W2A) (W1A) W1A (W1A) W2A (W2A) (W1A) W1A W1A (W2A) W2A W2A 9R 9R W1A 19 9L 27 (BL) 20 19 (B2) 9L DX1 DH (B1) DL1 W2A 27 W1A W3A ULA URA DF DR1 DF (DU) (W1A) (BR) DX1 DH (DX1) 20 (W3A) (W1A) (URA) (ULA) (DL2) (W2A) B2 (DL1) BR (DX1) (DR1) BL (DD) 2 B1
Parts List B1 1 S2 1 B2 1519mm S4 1 BL 1519mm S3 1 BR 837mm P1 2 837mm P2 1 L2 P3 1 L3 9R 2 9L 2 19 2 27 2 GC 4 F1 163 F2 24 L1 784mm UP1 M3 4 784mm M4 2 1468mm W1A 5 W2A 4 W3A F3 16 ULA V2 149 URA S1 122 20 2 DL1 1 DR1 1 DF 1 DX1 2 DH 2 DG 1 810mm 935mm 3
F1 B2 B1 1 B2 1 BL 1 F1 4 V2 4 V2 B2 Parts List BL BL B2 BL B1 BL BL DD F1 V2 B1 DU B1 DL1 F1 F1 DL2 B2 BR B2 4 BR DR1 BR 4 DX1 M4X10 BR B2 M4X10 B1 M5X12 BL F1 BR BR B1 B1 4
W2A W2A F1 4 V2 4 1 Assemble base bars from (B1) to (BR) with screws (F1) as following pictures shown. Make sure the base bar assembl in a perfect square.
W2A 2 F1 8 V2 8 W2A W2A V2 B1 F1 27 2 B2 B 27 x2 B 27 Before fixing the pole (#27), make sure that the shelf poles are in the correct position B2 A insert A x2 B1 6
L3 1 F1 6 V2 6 2 B1 1 B2 1 BL 1 BR 1 F1 8 V2 8 Place the wall panels (W2A) on the base bars four and secure with screws (F1) as showing. Side wall line up the holes with base bar.
W1A 2 3 F1 16 rners , the shed Place the top angle bars (L1), (L3), (L2) of wall panel. Line up the holes with wa screws (F1).
W1A 2 F1 16 4 V2 16 d (UP1) on the top ith panels and UP1 1 L1 1 L2 1 L3 1 F1 16 V1 16 V2 16 Then secure the remaining w bars with screws (F1).
UP1 1 F1 5 5 V2 5 Place the left doo insert into the wa Repeat the same l panels around the base UP1 W1A 5 W3A 1 F1 42 V2 42 V2 up F1 B1 down 6 Place 3 piece of th top angle bars wi and (S4) via screw W3A 1 F1 4 V2 4 W3A B1 V2 10 F1
URA 1 ULA 1 F1 8 olumn (ULA) on the top of base bar (B1), 8 (UL) with screw (F1). V2 the anel. Then secure the right door column (URA). F1 ULA 1 URA 1 F1 8 V2 8 URA V2 F1 ULA B1 1 F1 V2 8 8 S2 11 Place t internal setup ULA gable panels (S2), (S3) and (S4) on the screws (F1). Then connect (S2) with (S3) F2) as following pictures shown.
S3 1 S4 1 8 V2 10 roof panels (P1), (P2) and (P3) on the top.
F1 F1 M3 GC x2 V2 8 M3 Assemble the roof M4 x4 M3 ashing (M3) and (M4). M3 4 M4 2 GC 4 F1 6 V1 M4 6 V2 6 F1 F1 V2 GC M4 M3 M3 GC GC M3 M3 M3 M4 GC M3 M3 M4 M3 M3 4 M4 8 V2 8 20 9 Assemble the components of the door to hole alignment.
DX1 2 20 2 DL1 1 DR1 1 DG 1 F1 14 F2 F1 20 20 DX1 DG 6 F2 DR1 DL1 F1 DX1 20 20 F1 DH 2 F3 8 DH F3 DH 14 X2
F3 X2 DF F1 19 2 9L 2 9R 2 F2 16 F2 insert 19 27 9R 9L X2 15 27 DF 1 F3 8 F1 2
S1 122 S1 V2 F1