User Manual

C
B
Yellow Tail Boom (H0962-S)
Orange Tail Boom (H0964-S)
C
Finishing
Washer M3
(H0007-S)
15mm
15mm
7mm
Approx 725mm
7mm
H
I
Tail Boom Assembly
A
DETAIL A
Locking Element Tail Assembly
(H0249-S)
Double Sided Tape
[HA022]
Tail Boom
Carbon Road Support
(H0394-S)
Socket Head Cap
Screws M2.5x12mm
(HC026-S)
Tail Boom Assembly
Finishing Washer M3
(H0007-S)
Socket Head Cap
Screws M3x10mm
(HC056-S)
Socket Head Cap
Screws M3x10mm
(HC056-S)
Plastic Ball Link
(H0066-S)
Threaded Rod
M2.5x40mm
(HC242-S)
Tail Push Rod
4x
2.5x668mm
(HC240-S)
DETAIL B
Install H0394-S On The Boom
Before mounting H0394 on the boom, we recommend to first
tighten the M2.5 screw into the hole to open up the threads a bit.
This will allow for easier installation.
DETAIL C
Block Nylon Screws
(H0296-S)
Flat Head Cap
Screws M3x8mm
(HC134-S)
Boom Block
(H0298-S)
Metric Hex
Nylon Nut M3
(HC206-S)
Double
Sided Tape
Double
Sided Tape
[H0395]
Bags 7.9, 7.10, 7.11
Page 22
Chapter 13, Boom Assembly