Product Manual

GPTS-30
___________________________________________________________
7
The TS-30 A can be installed between
inverter (default) and a circuit panel supplied
by a larger amp alternating power supply
(dominant).
1. Connect the inverter to terminals 7 and 8.
2. Connect the 30-amp branch circuit to 5 and
6.
3. Connect the designated circuit panel to the
output terminals.
The inverter will only supply the load in the absence of the 50 amp power supply,
in which case, only the load designated to the 30 amp branch circuit is supplied.
The timer delay bypass switch on the TS-30 should be in the ON position.
3. Operational Testing
READ AND FOLLOW ALL SAFETY INSTRUCTIONS
1. Plug in the power cord. If the main panel circuit breakers are switched on, RV
load should operate normally. Unplug the power cord.
2. Start the generator. There is a pre-programmed 20-30 second delay in the
transfer switch. The delay is designed to allow the generator a brief warm-up
period. When the delay completes its cycle the switch should engage and the RV
load should operate normally. An audible click should sound as the switch
engages.
3. Shut down the generator. As the generator winds down the switch should
disengage without chatter or cycling. An audible click should sound as the switch
disengages.
4. Plug in the power cord. Start the generator. After the preprogrammed delay,
the switch should transfer power automatically from the power cord to the
generator. Listen for the audible click as the switch transfers, as there will likely
be no other indication that the switch has engaged. Shut down the generator and
unplug the powercord.
5. On transfer switch arrangements with three power supplies, plug in the power
cord, start the generator, and turn on the inverter. With all three supplies
energized at the same time, the switch will select the generator for the primary
supply choice. Shut down the generator. The switch will transfer to the power