User Manual

gpelectric.com | [page 19]
INSTALLATION
Should not
exceed 10 ft
Should not
exceed 25 ft
Air ConditionerAir Conditioner
170W
Solar Panel
170W
Solar Panel
Battery Bank
A minimum of 6 batteries / 600 Ah
battery bank is recommended for this kit.
(not included)
GP-
CEP-
25
8 ft Battery Cable
4 AWG (Included)
GP-
MPPT-
40
Solar Disconnect
GP-
MPPT-
40
Circuit Breaker
1 ft Parallization Cable
4 AWG, Cut from 9 ft Battery Cable
25 ft Solar Cable
10 AWG (Included)
10 ft Extension Cable
10 AWG (Included)
10 ft Extension Cable
10 AWG (Included)
3 ft Extension Cable
10 AWG (Included)
3 ft Extension Cable
10 AWG (Included)
GP-MPPT-R
Remote
170W
Solar Panel
170W
Solar Panel
170W
Solar Panel
170W
Solar Panel
Cable Entry Plate
Solar Controller
Solar Controller
SOLAR-AE6
only
GP-
CEP-
25
Solar Disconnect
Cable Entry Plate
25 ft Solar Cable
10 AWG (Included)
REV
ECO #
DESCRIPTION
DATE
DRAWN BY
A
- -
D
C
B
A
A
B
C
D
1
2
3
4
5
6
7
8
8
7
6
5
4
3
2
1
TITLE
B
1:33.3
A
1 OF 4
SHEET
SIZE
REVISION
SCALE
DRAWING NO
CAD REFERENCE
VALTERRA
PRODUCTS, LCC.
(GO POWER!)
201 - 710 REDBRICK STREET
VICTORIA, BC CANADA V8T 5J3
Tel [866] 247-6527
Fax [866] 607-6527
THE INFORMATION CONTAINED IN
THIS DRAWING IS THE SOLE
PROPERTY OF VALTERRA
PRODUCTS, LCC. (GO POWER!).
ANY REPRODUCTION IN PART OR
AS A WHOLE WITHOUT THE
WRITTEN PERMISSION OF
VALTERRA PRODUCTS, LCC. (GO
POWER!) IS PROHIBITED.
PROPRIETARY
ORIGINALLY DESIGNED BY
ORIGINALLY DRAWN BY
CHECKED BY
DATE
DATE
DATE
UNLESS OTHERWISE SPECIFIED
DO NOT SCALE DRAWING
INTERPRET DIMENSIONS AND TOLERANCES
PER ASME Y14.100-2000
TOLERANCES APPLY AS SHOWN BELOW
DECIMALS SURF FINISH ANGLES
X
X.X
X.XX
X.XXX
± 2.5
± .25
± .10
± .01
1
METRIC
THIRD ANGLE PROJECTION
DOC #
DATE
2017-11-09
102
A
DOC REVISION
AE
ALL COMPONENTS AND PROCESSES TO BE ROHS COMPLIANT, CERTIFICATE REQUIRED WITH INITIAL SHIPMENT
1.5 μm
9. For the SOLAR-AE6 kit, cut 1 ft. from the 4 AWG, 7 ft. positive (red) battery cable.
10. Strip 1/2” of insulation from the end of the 6 ft. positive battery cable and both ends of the 1 ft. positive battery cable, pre-
viously cut.
11. Insert the stripped end of the 6 ft. positive battery cable into the battery positive terminal of the primary GP-MPPT-PRO-60.
12. Insert the stripped ends of the 1 ft. positive battery cable into the parallel battery positive terminals of the primary and sec-
ondary GP-MPPT-PRO-60.
13. Cut 1 ft. from the 4 AWG, 9 ft. negative (black) battery cable.
14. Repeat steps 9-11 for the negative (black) 8 ft. and 1 ft. battery cables, but inserting the stripped ends into the battery neg-
ative and parallel battery negative terminals of the primary and secondary GP-MPPT-PRO-60.
15. Secure the Ethernet cable to port A of one controller and to port B of the other controller.
4.7 GP-MPPT-PRO-R CONTROLLER REMOTE
1.
Using location planned for the GP-MPPT-PRO-R controller remote, follow the GP-MPPT-PRO-R User Manual regarding
installation.
2. Connect the remote to the GP-MPPT-PRO-60 and the GP-MPPT-PRO-R remote via the supplied cable.