User's Manual

GO MBW Getting Started Guide
GO MBW Getting Started GuideGO MBW Getting Started Guide
GO MBW Getting Started Guide
Draft Version - Confidential - Page 26
Post Installation Testing Procedure
The purpose of the post-installation testing procedure is to verify connectivity
between the WLS and the WNC units to enable Internet services to client stations.
Once the WNC has been installed, connectivity with the router/switch should be
verified. This will enable the WNC to communicate with the Radius server as well as
the WLS.
Once the WLS has been installed and configured, connectivity to the WNC should be
verified. In addition, connectivity between the client stations and the WLS should be
verified.