User's Manual

GO MBW Getting Started Guide
GO MBW Getting Started GuideGO MBW Getting Started Guide
GO MBW Getting Started Guide
Draft Version - Confidential - Page 23
Cable Connections
The WLS unit connections are very simple and can be accomplished in only a few
minutes. When mounted, the WLS should be installed with the connecters at the
bottom of the unit. Before completing the installation, you should connect the power
and grounding cables.
Connection Panel on WLS
Consol Port:
RS23
2
Power Port:
-
48v
connector
Ethernet
Interface:
10M/100M
Grounding Screw
LED
Green
There is power to the unit.
Unlit:
There is no power to the unit.
Power
Green
The WLS unit is operational.
Red
Status LED is still red, contact technical support.
Statu
Green
Traffic is flowing through the WLS unit.
Unlit:
No traffic is flowing.
Activity
Not used in current version.
Blank
The WLS
-
in tests have failed. Restart the unit. If the