Installation Process
Installing the WLAN Sector Base Station involves the following steps:
Performing a site survey
Infrastructure development
Installation of hardware and connectors
Power up and software configuration
Brief testing process to verify connectivity and operation
Site Survey
Most wireless LANs include many access points installed in various locations in an
overlapping radio-cell pattern. It is important to carefully position each access point's
positioning and the assignment of its radio channels. Therefore, a site survey
becomes an essential first step before physically deploying the GO MBW solution.
Installation of the access points requires a distribution system, such as Ethernet, to
interface the access points to the corporate network or Internet. Part of the site
survey should include a detailed understanding of changes that may need to be
made to the site (selecting and/or installing poles, for example).
Recommended Site Requirements
It is highly recommended that the WLS unit(s) be mounted near the edge of the roof
of a tall building (preferably the tallest building in the area). The WLS unit should be
pointed in the direction of the area to be covered. To provide maximum coverage,
multiple WLS units can be installed on the same rooftop. However it is important to
leave some distance between each unit in order to prevent interference between the
units themselves. When choosing the ideal location, it is also important to take into
consideration the overall area topology.
For more information, please consult with your GO Networks representatives.
Infrastructure Development
Infrastructure development is likely to vary depending on location. In general, this
step would include preparing the locations where the WLS units will be installed. This
may include laying cables and locating an electricity source close to where the WLS
unit will be installed.