User Manual
Table Of Contents
- Page 19 of 22 -
All contents are Copyright © 2007 GO Networks, Inc. All rights reserved.
Power Up and Software Configuration
The MBW 510 unit is normally mounted on a streetlight (pole or wall)
where it is inconvenient to configure. Therefore, it is recommended that
wireless communication be established to the unit prior to installation, so
that the unit can later be configured and monitored from the ground. To
verify communications when installing the MBW 510 unit, the Mesh-
Gateways must be installed and powered up first.
The LEDs on the MBW 510 unit indicate the status of communications
between the MBW 510 unit and the network. See Table 6 for more
information on the LED indicators.
When powering up a Mesh-Node, the BH LED should be lit to verify that
the MBW 510 unit’s wireless communication is connected. MBW 510 boot
time is about 2.5 minutes. The BH LED indicator will light up after the boot
is completed.
LED Function
PWR
Green – There is power to the unit.
Unlit – There is no power to the unit.
ETH
Green – When the LED is on, there is a communication connection.
When the LED is flashing, traffic is flowing though the MBW 510 unit.
Unlit – There is no communication connection.
Table 6: MBW 510 LED Indicators