User Manual

Cable Connections
When the MBW 510 is properly aligned, the connecters are located at the
bottom of the unit.
Cable requirements are often unique to the location and deployment
topology of each installation. As a result of this limitation, the Ethernet and
grounding cables are not included in the installation kit.
The following cables are required to install the MBW 510 unit and should
be connected in the following order:
- Page 14 of 22 -
All contents are Copyright © 2007 GO Networks, Inc. All rights reserved.
Grounding Cable – Provides the necessary electrical safety
functions.
Ethernet Cable – Required only for MBW 510 units connected to a
wired network.
Power Cable – Supplies AC power to the MBW 510 unit. The
supplied AC power cable is designed to connect directly to a
photocell power adapter.
Table 4 lists the MBW 510 Connectors Kit parts:
Item
No.
Description Qty
Picture
A
Solderless
Ring Terminal
1
B
Sealed RJ45
connector
1
Table 4: Mounting Kit Part List