Owner manual
0020096883_02 - 08/10 - Glow-worm
- 10 -
INSTALLATION
5.1.3 Removal of condensate
When the heat pump is operational, it will produce condensation
that needs to be drained off.
1
2
3
A
1
3
2
B
Key
A Congurationwithinclinationtotheleft
B Congurationwithinclinationtotheright
1 Heat pump
2 Plug
3 Drainage elbow
• Insert the drainage elbow (3) and pipe into the correct
opening depending on the angle of the heat pump.
• Seal off the other opening with the supplied plug (2).
5.2 Boiler circuit
5.2.1 Connection from the hydraulic module to
the boiler
i
Make the connection limiting the load losses to a
minimum (the circuit should be as short as possible,
avoid bends and narrow sections...).
i
Refer to the installation manual delivered with the
boiler for domestic hot water system connections.
4
5
1
2
3
Key
1 Flow boiler connection (Ø ¾")
2 Flow boiler tubing (not included)
3 Boiler
4 Return tubing leading to the boiler (not included)
5 Return connection (ؾ") leading to the boiler
• Connect a pipe (4) to the return connection (5) leading to the
boiler.
• Connect a pipe (2) to the ow connection (1) leading away
from the boiler.
• Refer to the boiler instructions to connect the pipes (2) and
(4) to the boiler.