Installation Guide
Loosen off (but do not remove) the three screws along
the side edge of the RIGHT FRONT corner panel.
Then, by slightly prising the back edge of the corner panel
away from the frame with your hand, slide the front edge
of the wall sheet in behind.
See diagram 12A.
Re-tighten the three screws in the corner panel
and secure the full wall sheet, using screws,
in the numerical order shown in
Diagram 11A.
NOTE: For aesthetics, we recommend the last sheet at the
right side (towards the front) underlaps the right front
corner panel. This 'underlapping' creates the appearance
of the shed wall being one continuous sheet.
Fitting last sheet at right side to right front corner panel.
Step 11A
Diagram 12A
BACK
RIGHT FRONT CORNER
PRISE UP
CORNER
PANEL AWAY
FROM FRAME
FRONT EDGE
OF LAST FULL
WALL SHEET
RIGHT
FRONT
CORNER
PANEL
LOOSEN OFF
SIDE SCREWS
FRONT
RIGHT FRONT CORNER
FRONT EDGE OF
LAST FULL
WALL SHEET
SLIDES IN BEHIND
CORNER PANEL
RIGHT FRONT
CORNER
PANEL
21
© Globel Industries Pty Ltd
GI00034 November 1 2014
E N G L I S H










