Soup Warmer Owner's Manual
Page 6
Installation
INSTALLATION
1. Read this manual thoroughly before installation and operation. DO NOT proceed with installation and
operation if you have any questions or do not understand anything in this manual. Contact your local
representative or Globe rst.
2. Remove soup warmer from box. Once your soup warmer has been removed from packaging, be certain that
protective plastic and residue is removed from all surfaces.
3. Inspect soup warmer to make sure all parts have been provided, if applicable.
4. Select a location for soup warmer that has a level, solid, nonskid surface that is nonammable and away from
water hazards or sinks. Soup warmer must be in a well-lighted work area away from children and visitors.
5. Install soup warmer in its location with at least 5'' between soup warmer and walls or other objects.
6. Proper connections and power supply are essential for efcient performance.
This equipment gets EXTREMELY HOT so make sure all ammable/combustible
materials are set away from this equipment.
COMMISSIONING:
Commissioning of your new Soup Warmer is of the utmost importance. Commissioning is the thorough and
methodical testing of the equipment, sub systems, and systems to ensure that the nal product functions properly
and safely at the work site. By identifying any potential problems (i.e.: equipment location, ventilation, local re/
electrical codes, installation, operator training and certication) prior to equipment being placed into service, costly
outages and potential damages may be avoided.
SAFETY ALWAYS.