Assembly Instructions
1. Create the right side of the shelving
unit by laying the uprights side-by-side
on a flat surface.
Important: One side of the uprights is
longer that the other, and contains two
sets of holes. When laying the uprights
side-by-side, this long side should be
on the floor, and the short side
should be facing up.
2. Place end panels (see chart below) on the uprights.
2a. Used for most single-unit
installations. Also used on each
end of a row of units. Make
sure the end panel fits into
the inset of the uprights.
2b. Used as the center,
joining upright bank of
units. The end panel
should be sandwiched
between the upright posts.
Ht. Panels
39" (1) 39"
63" (1) 39" (2) 13"
73" (2) 39"
85" (2) 39" (1) 13"
97" (2) 39" (2) 13"
3. Bolt the panels into the small holes near the edge of both uprights
using
1
/4-20 x 5/8” bolts and nuts. Leave 16 or 17 holes (16 or 17 inches)
between each bolt, as shown in the drawing. Also, if you can pre-
determine where you want your shelf levels to be, try to position the bolts
where they will not interfere with the shelves; this will avoid having to
move them later. Finger tighten only at this point, as binding may occur
during shelf placement if side panels are attached too tightly.
Note: The three holes at the top of the upright must be left open,
as shown, to avoid interference with the top shelf.
4. Repeat steps 1-3 for the left uprights.
Tools Required:
•
7
/16" nut driver or socket
• Flathead screwdriver.
• Requires two people
for assembly.
• Approximate assembly time:
15 to 30 minutes per unit.
Note: Number of shelves
per unit varies depending
on unit purchased.
Note: Back and side panels
are split to make them
easier to ship. Depending
on the height of the unit
purchased, a number of
different panels will be
included. Refer to side
panel chart in Step 2.
CLOSED INDUSTRIAL SHELVING
Assembly
Instructions
Customer Service
1-800-645-2986
1
Starter
Starter & Add On
Back-To-Back




