Installation Guide
STEP 1:
NOTE: Before cutting the rough opening,
check for pipes, electrical cables, or heating
ducts. If it is required to remove part of
stud, make sure that the wall is not a load
bearing wall.
Prepare the opening in the wall for the
cabinet body. Make sure that there is
support on both sides of
the opening to
attach the cabinet body , as shown.
NOTE: The
cabinet height should be a
minimum 2
in. above faucet.
RECESS MOUNT
INSTRUCTIONS
NOTE: Rough opening is not an exact
measurement. The extra space allows
cabinet to be inserted into the
opening. Add shims to level and tighten
space if necessary. Additional framing
might be required.
STEP 2:
Position the cabinet body in the rough
wall opening. Make sure that the cabinet
body flange covers the wall opening uniformly.
Secure both sides of the cabinet body to
the wall supports using mounting screws .
NOTE:
The cabinet body must be
level for the door to work properly.
4