Installation Guide
9. Mark second hole (Point D) 5-1/2” from right gate post hole (Point C). Hole
(Point D) will also contain fence pole of connecting fence section.
10. When drilling holes A and D for fence, drill plum and level with deck.
11. Drill holes for left and right gate posts (B and C) angling towards each other 4
degrees. For best results use the Cantar Protect-A-Pool Drilling Guide.
12. Continuing installing fence, attach fence to sides of gateposts with hook and eyes
supplied.
13. Once fence panels have been installed and tension applied, hang gate by attaching
hinges to frame with the self-tapping screws supplied. Hinges should be attached
with tension adjustment facing up and ridge flat against gate frame.
14. Attach frame to posts. Frame should be hung level with top of fence.
15. Attach latch and strike to frame. Follow directions on latch packaging. For 4’
fence, top of latch should be 54” from the ground. For 5’ fence top of latch
should be 60” from ground.
16. Adjust tension on gate by turning eye closer or further away from fence.
17. Large washers are supplied to shim gate if necessary. Shims are installed
underneath gate flange and through stainless steel rods.
18. Use center hole to bolt gate into position (recommended for safety). To do this
drill !” hole and tap anchor into place (hardware included) then slip (small)
washer onto bolt and through gate flange. Turn until tight and gate is level.
19. Continue to adjust tension if necessary with shims.