Installation & Assembly

7
Verify that all beams are properly assembled and rmly seated
into the top and bottom post slots.
8. Check all beams
Using two people, move the rack shelving to its nal location.
9. Move shelving
Repeat steps 1 and 2. We recommend adding the section at
the top notch of the post. Add the horizontal and side support
beams. Add shelf.
7. Assemble top shelf