Installation & Assembly
7
Verify that all beams and tie channel supports are properly
assembled and rmly seated into the top and bottom post
slots.
10. Check all beams and tie channels
Using two people, move the rack shelving to its nal location.
11. Move shelving
Insert top post (P2) into bottom post (P1) until
you hear a click.
NOTE: Posts may appear loose until
completion of step 8.
7. Add top post
Repeat steps 1 and 2. We recommend adding a section at
notch 8 from the top of the post. Add the horizontal and side
support beams. Add tie channel support and shelf.
8. Assemble 4th shelf
Repeat steps 1 and 2. We recommend adding section at the
top of the post. Add the horizontal and side support beams.
Add tie channel support and shelf.
9. Assemble 5th shelf
P2
P1










