Installation Instructions
7
Verify that all support beams (P2) and tie channel supports
(P3) are properly assembled and firmly seated into the top
and bottom post slots.
6. Check all beams and tie channels
Using two or more people, move the rack shelving to its final
location.
8. Move shelving
Check that the rivets are held behind the smaller hole of the
support beam keyholes. Repeat steps 4 and 5 for each tie
channel support.
A
B
C
5. Check the rivets
Place the wire shelf (P1) on top of the tie channel supports (P3)
for each shelf.
7. Add wire shelves
Two or more racks of the same height and depth can be
connected by sharing the same (P4) welded-end frame
between them.
NOTE: Ensure there are at least two shelves per rack between
each set of (P4) welded-end frames.
9. Move shelving
P2
P3
P1
P3
P4
P3
P2
Smaller
hole