Installation Guide
3
Pre-installation
PLANNING INSTALLATION
Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents. If any part is
missing or damaged, do not attempt to assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 30 minutes
Installations may vary depending on how the previous showerhead was installed. Supplies necessary for the installation of the showerhead are not all
included; however, they are available wherever plumbing supplies are sold.
Prior to beginning installation, turn off the hot or cold water lines, then turn on the old showerhead to release built-up pressure. When installing the new
showerhead, turn the connector nuts nger tight. Wrap all threaded connections with PTFE pipe tape. Always wrap in a clockwise direction.
TOOLS REQUIRED (not included)
Adjustable
Wrench
HOMEDEPOT.COM/GLACIERBAY
Please contact 1-855-HD-GLACIER for further assistance.
PACKAGE CONTENTS
Part Description Quantity
A Rain can showerhead 1
B Thread sealant tape 1
A
B