Installation Guide

5 HOMEDEPOT.COM
Please contact 1-855-HD-GLACIER for further assistance.
Installation (continued)
2
Connecting the shelves to the tube
NOTE: Assembly shown for a 92 - 97 in. installation.
NOTE: The tapered end of the long tube (C) should be at
the top.
NOTE: Shelves (E,F and G) can be adjusted by loosening
the pre-attached set screw and moving the shelf up or
down.
Slide the shelf with towel bar (G) down one of the long
tapered tubes (C) and tighten the pre-attached set screw.
Slide the shelf with hooks (F) down one of the long tapered
tubes (C) and tighten the pre-attached set screw.
Repeat this process for the other long tapered tube (C) and
the other shelves (E).
1
Measure distance to ceiling
NOTE: No matter the distance, tubes (A) and (B) are
ALWAYS used.
Measure the distance between the tub ledge or the shower
stall oor to the ceiling to the nearest inch.
Refer to the Troubleshooting section at the end of this
manual to know what tubes (C) and (D) that are needed.
G
tapered end
C
pre-installed set screws
F
tub ledge
shower stall oor