Installation Guide

Table Of Contents
As shown in the figure, install the outlet pipe and
wind the sealing tape counterclockwise at the
thread connection. It is required to wrap several
rounds to ensure the sealing effect.
Installation is finished, test whether each function
is used normally, wipe clean bibcock surface
with soft cloth.
.
depth2.17"-2.56"
Open the water source to test whether the left
and right inlet pipes are tightly connected without
leakage. After the inlet pipes are tested and
closed, adjust the flow switch to be in the open
state to test whether the mixed outlet pipes are
tightly connected without leakage.At the same
time the function of water retention, according to
the embedded box is installed into the solid wall
inside the tapping screw embedded box is fixed
on the wall.
According to the basic size of the embedded
box, use a special tool to cut the main hole on
the solid wall. The depth of the hole is shown
in the figure. The distance between the surface
after the final treatment of the wall and the
bottom surface of the hole should be considered
between 2.17"-2.56".
As shown in the picture, paste the ceramic
tile, and open two holes with a diameter of
1.97" in the middle, and the distance between
the two holes is 5.91".
Once again, make sure that the pipe connection
is correct and there is no leakage in the water
test. After the installation of other embedded
components of the shower, seal and fix the
embedded box and pipe with packing. At this
point, the solid wall embedded box is installed
and the plastic protective cover is taken out.
First find a good stainless steel fixing bracket,
with screws locked in the embedded box
protruding position.
As shown in the figure, pre-bury the intake
water pipe, pay attention to the upper and
lower direction of the embedded box, the
lower right interface is connected with the
hot water pipe, the right interface is connected
with the cold water pipe.
Hot water inlet pipe
Cold water inlet pipe
5
.9
1
"
Ø
1.
97"
Ø
1
.9
7
"