Instructions / Assembly

205
Mark the position of the
screw hole on the wall,
drill and install the water
inlet body.
cold water
hot water
Interior wall
PS:In the process of embedding the wall,
please do not remove the protective sleeve to avoid damaging the copper sleeve.
Please read the instructions before installation
sealant
Allen key
slotted screwdriver
Phillips screwdriver
The interior wall is flush with the main plane
Ceramic tile surface
1. After unpacking, check whether the product is in
good condition. The tools required for installation
are not supplied with the goods. Please bring
them yourself;
2.The instructions contain precautions, please
keep them properly;
3.The dimension drawing of the manual is only for
reference, please take the real object as the
standard.
1.The sundries at the connection must be removed
before installation to avoid blockage or water
leakage.
2.Correctly connect the tap water inlet (hot on
the left and cold on the right)
3.The maximum temperature of hot water shall not
be higher than 80
After the main body is embedded in the wall, install it in the following order:
1.Remove the protective sleeve;
2.Cover the panel;
(mm)
5"
(120mm)
1.92"
(49mm)
8"
(205mm)
2-G1/2
205
3.Install the handle and water outlet connector.

Summary of content (1 pages)