1.Dig pipe grooves for 4.Install the upper outlet pipe and the top shower head. o.Install the stand for hand-held shower head per-burying pipes. pa (wrap the FEET tape on the thread) (Wrap the FEET) tape on the thread) | (embed the thread flush with the tile surface) (embed the thread flush with the tile surface) CN 4.7" Pe gi ped | pr I pigs 5.Install waist sprayer < 0 Be (Wrap the FEET) tape on the thread) (embed the thread flush with the tile surface) 1.