Installation Instructions
(800) 348-0746 www.gilpininc.com ©Gilpin Inc. 2011
sales@gilpininc.com
Install Your Embassy™ Fence/Railing or Metalist™ Fence from Gilpin
Tools you may need
Level Tape Measure Drill Hacksaw 3/8” Box or Socket
Flat Screwdriver Center Punch Hammer Scriber or Pencil
1. Install posts.
a. Location of posts determines placement and location of panels.
b. If in-ground mounting, posts should have at least 24” buried.
c. If surface mounting:
i. To concrete, follow directions provided with masonry anchors. To guard against
breaking or chipping, install flanges 3”- 4” from any edge.
ii. To wood, use lag screws
d. Posts must be plumb and aligned for installation. (If surface mount posts are not plumb,
use shims as needed.)
2. If necessary cut panels to fit between posts. Insure equal space between post and first picket at
either end of panel.
3. Attach panels to posts using P/N 865 Adjustable Fittings.
a. Drill ¼” diameter holes approximately 7/8” from each end of both top and bottom rails.
Mark location using template provided with fitting set.
b. Drill 3/16” pilot holes in newel post for self-tapping screws. Use fence to determine
location.
c. Four inch (4”) space under bottom of pickets is recommended for best appearance.
d. Attach L-shaped bracket to panel with nuts and bolts provided.
4. FOR EMBASSY™ ONLY! If using on slope, slant before cutting.
a. Apply pressure to top rail downward and endward until desired angle is achieved.
(Spindles will remain vertical)
b. Cut rail ends parallel with spindles
c. Bend P/N 865 Adjustable Fittings to match angle
5. Tighten all connections.
6. Product has baked on finish. Touch up scratches and cuts with rust resistant paint.
METALIST
EMBASSY


