Instruction Manual

PAGE 26
ENGINE END VIEW
GENERATOR END VIEW
SIDE VIEW
TOP VIEW
SENTRY−PRO DIMENSIONAL OVERVIEW PRINT MODEL SPP−180
DRAWING NOT TO SCALE & DIMENSIONS = IN [MM]
(A) (4) LIFTING HOLES IN BASE:
1-1/2" DIA. HOLES ARE INSTALLED IN BASE, FOR
LIFTING EQUIPMENT. REMOVE PLASTIC COVERS
IN THESE HOLES, AND RE-INSTALL COVERS WHEN
GEN-SET IS IN PLACE.
(B) DRY FUEL CONNECTION:
LPG OR NAT. GAS CONNECTION IS LOCATED ON
THE ENGINE END PANEL AS SHOWN. THERE IS A
3/4" THREADED PIPE COUPLING FOR CONNECTION.
(C) ELECTRICAL & GROUND CONNECTION:
THERE ARE TWO KNOCK-OUT HOLES ON THE LEFT
HAND SIDE OF GENERATOR END. BOTH HOLES
ARE FOR 3/4" CONDUIT. (1) 1.5"Ø HOLE IN BASE
FOR STUB-UP
(D) CONTROL DOOR PANEL:
THIS PANEL IS HERE TO HELP WITH INITIAL WIRING
INSTALLATION AND QUICK ACCESS TO GENERATOR
CONTROLS. QUALIFIED PERSONEL ONLY: UN-LOCK
AND OPEN, CONTROL DOOR. REMOVE ROOF
SCREW AND SLIDE BLANK PANEL DOWN AND OFF,
FOR FULL WIRING ACCESS
(E) EXHAUST CHUTE:
LOCATED IN THIS CHUTE, IS WHERE THE EXHAUST
PIPE & MUFFLER RESIDES, PLEASE KEEP CLEAR
WHILE UNIT IS RUNNING OR HOT. DO NOT INSTALL
UNIT WHERE THE EXHAUST MAY COME INTO
CONTACT WITH FLAMMABLE OBJECTS.