Instruction Manual
PAGE 25
ENGINE END
PANELS REMOVED
FOR MOUNTING
BOLT VIEW
MOUNTING DIMENSIONS FOR 3600 RPM SPS SERIES STANDBY SETS 12 KW
COOLING AIR
INTO ENGINE
MOUNTING PAD SHOULD
BE SET ON A 3" HIGH
BED OF CRUSHED GRAVEL
33" WI X 48" LG X 2" HI
OPTIONAL RE-INFORCED POLYETHYLENE
PAD. NOTE: PAD AND MOUNTING
HARDWARE IS SHIPPED LOOSE FOR
INSTALLATION BY OTHERS.
(2) MOUNTING HOLES
1/2" HIGH PITCH IN ROOF
FOR DRAINAGE OF WATER
COOLING AIR
INTO GENERATOR
DRY FUEL CONNECTION
INSTALLATION INSTRUCTIONS FOR INSTALLED GEN-SET
BASE TO FREE STANDING POLYBASE:
INSTALL (2) BOLTS THRU HOLES IN POLY BASE, AS SHOWN,
USING 5/16-18 HEX NUT TO LOCK BOLT IN PLACE. INSTALL
GEN-SET AND METAL BASE ONTO EXTENEDED 5/16-18 BOLT
AND SECURE WITH LARGE FLAT WASHER AND HEX NUT.
CAUTION: TIGHTEN NUT ONLY TO HOLD THE METAL BASE TO
PLY BASE. CONTINUED TIGHTENING WILL CAUSE METAL
BASE TO BEND INWARD.
NOTE: IF POLY BASE IN NOT USED, AND CEMENT PAD IS
REQUIRED, THE 2-BOLTS IN CEMENT PAD MUST BE 5/16-18
AND EXITED OUT FROM CEMENT, 3-1/2". USE CEMENT PAD
BOLT PLACEMENT DRAWING FOR POSITIONING THESE (2)
BOLTS.
NOTE: NOUNTING BOLTS ARE POSITIONED INSIDE LOCKED
CABINET, AS A DETERRENT TO THEFT. OUTSIDE MOUNTING
BOLTS HAVE MADE THEFT TOO EASY WHEN GAS AND
ELECTRIC LINES ARE REMOVED.
(2) 5/16-18 X 3-1/2" LG HHCS
5/16-18 HEX FLANGE NUT
AND FLAT WASHER
5/16-18 HEX FLANGE NUT
CEMENT PAD