Instruction Manual

PAGE 24
DRAWING NOT TO SCALE & DIMENSIONS = IN [MM]
(A) (4) LIFTING HOLES IN BASE:
1-1/2" DIA. HOLES ARE INSTALLED IN BASE, FOR
LIFTING EQUIPMENT. REMOVE PLASTIC COVERS
IN THESE HOLES, AND RE-INSTALL COVERS WHEN
GEN-SET IS IN PLACE.
(B) DRY FUEL CONNECTION:
LPG OR NAT. GAS CONNECTION IS LOCATED ON
THE ENGINE END PANEL AS SHOWN. THERE IS A
3/4" THREADED MALE PIPE FOR CONNECTION.
(C) ELECTRICAL & GROUND CONNECTION:
THERE ARE TWO KNOCK-OUT HOLES ON THE LEFT
HAND SIDE OF GENERATOR END. BOTH HOLES
ARE FOR 3/4" CONDUIT.
(D) CONTROL DOOR PANEL:
THIS PANEL IS HERE TO HELP WITH INITIAL
WIRING INSTALLATION AND QUICK ACCESS TO
GENERATOR CONTROLS. QUALIFIED PERSONEL
ONLY: UN-LOCK AND OPEN, CONTROL DOOR.
REMOVE ROOF SCREW AND SLIDE BLANK PANEL
DOWN AND OFF, FOR FULL WIRING ACCESS
(E) EXHAUST CHUTE:
LOCATED IN THIS CHUTE, IS THE EXHAUST PIPE
OF MUFFLER PLEASE KEEP CLEAR WHILE UNIT IS
RUNNING OR HOT. DO NOT INSTALL UNIT WHERE
THE EXHAUST MAY COME INTO CONTACT WITH
FLAMMABLE OBJECTS.
ENGINE END VIEW
GENERATOR END VIEW
SIDE VIEW
TOP VIEW
GEN−SET DIMENSIONAL OVERVIEW PRINT OF MODEL SPS−120