Taking measurements
Gigaset N720 DECT IP Multicell System / engbt / A31008-M2316-L101-2-7619 / measure.fm / 10.02.2012
Version 2, 06.08.2010
¤ Install the measuring base station at this location and take the measurements as for
the first position.
¤ Enter the results in the plan and the measurement log.
¤ Now take this measurement for all planned assembly locations.
Example of a measurement log for measuring the synchronisation overlap
The result of the measurement is that the signal strength is sufficient for synchronisation
everywhere. Base station E only receives base station D with sufficient quality.
Here, a sensible synchronisation hierarchy would be:
Measuring
point
Base station A Base station B Base station C Base station D Base station E
A –52 dBm/100% –40 dBm/100% –58 dBm/100% ----
B –50 dBm/100% –48 dBm/100% ---- –70 dBm/92%
C –42 dBm/100% –46 dBm/100% –50 dBm/100% ----
D –60 dBm/100% ----- –48 dBm/100% –64 dBm/100%
E ---- –68 dBm/94% ---- –62 dBm/100%
Sync level 1 Base station C
Sync level 2 Base stations A, B and D
Sync level 3 Base station E
A
B
C