Owners manual

6. NOW INSTALL GIBSON HEADER WITH SUPPLIED GASKET RE-USING STOCK BOLTS TORQUING TO 30-
35 FT-LBS FROM CENTER OUT. AFTER HEADER IS IN PLACE, USE SUPPLIED HEAT WRAP ON SPARK
PLUG WIRES AND ZIP TIE TO KEEP AWAY FROM HEADER FOR HEAT PROTECTION. (NOTE: MAKE SURE
ALL WIRES AND HOSES HAVE PROPER CLEARANCE FROM HEADER!)
7. AFTER HEADERS ARE IN PLACE. RE-INSTALL FACTORY Y-PIPE ASSEMBLY USING SUPPLIED BOLT KIT.
NOW RE-CONNECT BATTERY. CHECK FOR ALL PROPER CLEARANCES THEN START VEHICLE AND THEN
CHECK FOR ANY LEAKS. AFTER WARM-UP LET VEHICLE COOL DOWN AND RETORQUE ALL FASTENERS.
8. PERIODICALLY CHECK AND RETIGHTEN THE HEADER BOLTS.
NOTE: IT IS NOT UNUSUAL WHEN INSTALLING HEADERS TO GET A BURNING SMELL.
THIS IS NORMAL AND IT WILL GO AWAY!