Owners manual
13.FROM UNDERNEATH THE VEHICLE RE-CONNECT THE Y-PIPE ASSEMBLY USING SUPPLIED
HARDWARE AND USING 11/16 SOCKET. TORQUE TO 50 FTS.
14.RECONNECT THE POSITIVE BATTERY CABLE.
15.RE-CHECK EVERYTHING!
16.START THE ENGINE, CHECK FOR LEAKS AND TEST DRIVE.
17.MAKE SURE YOU RE-TORQUE YOUR HEADER BOLTS AND Y-PIPE ASSEMBLY AFTER THE
FIRST 100 MILES, THEN ONCE A MONTH FOR THE FIRST SIX MONTHS.
18.PERIODICALLY CHECK AND RE-TIGHTEN THE HEADER BOLTS, WE RECOMMEND WITH
EVERY OIL CHANGE TO PREVENT HEADER LEAKS.
NOTE: IT IS NOT UNUSUAL WHEN INSTALLING HEADERS TO GET A BURNING
SMELL. THIS IS NORMAL AND IT WILL GO AWAY!
PARTS LIST:
(1) DRIVER'S SIDE HEADER ASSEMBLY
(1) PASSENGER'S SIDE HEADER ASSEMBLY
(2) HEADER GASKETS
(1) BOLT KIT
(1) ANTI SEIZE
(6) 2X5 HEAT WRAP