Instructions / Assembly
4. Overlapping shingles can be sealed to the vent base
using an elastomeric sealant. Do not use asphalt based
roof cements.
3. Cover as much of the vent flange as possible with
shingles. When nailing the roofing material near the vent
do not let fasteners penetrate the vent flange.
Note: Be sure to remove the 1/4 inch screen if it is to be used as a dryer vent.
CAUTION! Working above grade is inherently dangerous, be sure that proper fall protection measures
are in place. When working with power tools, gloves and eye protection are absolutely required.
These installation guidelines are for use with typical or standard applications. It is always recommended to seek advice from a licensed professional, and to
check with your local building inspector or building permit office for approvals and possible variations that may apply.
PLASTIC ROOF CAP
INSTALLATION GUIDELINES
2. Secure vent with four galvanized roofing nails through
provided holes in vent flange.
1. Carefully lift shingles above the vent hole.
DO NOT USE STAPLES
1
4
3
2
www.gibraltarbuildingproducts.com
#PRCS4DBR
1 2
3 4