Installation Guide
1. Ensure tub surface is protected during assembly, installation and the nal phase of
construction.
2. Place tub on oor, upside down, and attach feet to tub with fasteners provided.
Do not overtighten.
3. Turn tub right side up, place in desired position and mark foot anchoring locations.
4. Carefully move tub and drill (4) 7/16” diameter holes in the oor to accommodate the foot anchors.
5. Place tub back in position, dropping the threaded studs into the holes in the oor.
This will prevent the tub from sliding on the oor. If needed, adjust the height of the disc on the
threaded stud to level the bathtub.
NOTE: We strongly recommend that you secure the tub to avoid any tub movement and possible
damage to water supply lines. However, if you choose to not secure the tub, the adjustable
disc can be moved to the end of the threaded stud to create a at surface for the tub to sit on.
The threaded stud can then be screwed up/down to level the tub as needed
TUB BOLT
NUT
LOCK WASHER
PLAIN WASHER
FOOT
ADJUSTABLE DISC
THREADED STUD
DRILLED ANCHOR
HOLE
FLOOR
TURN ADJUSTABLE DISC UP/
DOWN TO LEVEL TUB, AS NEEDED
SCREW THREADED STUD UP/DOWN TO DESIRED
HEIGHT BASED ON DEPTH OF THE HOLE IN THE FLOOR
Please leave this sheet and warranty for the customer for future reference
CANNON BALL AND BALL & CLAW FEET
Installation Instructions
BALL AND CLAW (10/30/07) ©GIAGNI COLLECTION 2007
1 888 560-5222 USA
8 a.m. to 6 p.m. EST Monday-Sunday
For additional assistance or service call:
Para servicio o ayuda adicional, Ilame al:
Giagni

