Installation Sheet
1
Giagni
CONTEMPORARY FLOOR MOUNT TUB FAUCET
NSF /ANSI 61
3
7
(Allen Wrench)
1
Step 1 Install #1 spout into
faucet body by pushing straight
down. Align spout facing forward
then tighten with #3 allen screw
(packaged separately with #7 allen
wrench). Do Not Over Tighten.
Step 3 Attach hot and cold risers
C-FRSR to union nuts on back of
faucet body using one #10 rubber
gasket on each riser.
Step 2 Screw #16 handle hub
onto hot/cold cartridges #9 & #17.
Disassemble handle by unscrewing
spokes
and install onto cartridge
by securing with screw included.
Reassemble handle.
1
10
C-FRSR
Union Nut
C-HLVR
17
9
C-HCRS
16
16
Screw
Spokes
Spokes
Tub
Drain
Washer
C-FB1
C-FRSR
Optional
Support Brace
U-SBRC
Floor Flange (26)
MIN. 3-3/4"
MAX. 5-1/2"
Decorative
Escutcheon (25)
C-FRSR
Step 4- Drill (2) 1-1/8” holes into oor on 8”
centers for hot and cold water supplies (see
g. 5 next page). Supply holes should be
drilled at 3 ¾” minimum to 5 ½” maximum
from drain outlet (center to center).
Step 5- If desired, attach U-SBRC support
bracket to risers. See page 4. (Tub model
LCAT-167 does not have an exposed drain so
support brace will not be used)
Step 6- Slide #25 decorative escutcheon
onto bottom of risers C-FRSR and push
part way up. Screw #26 oor ange onto
threaded portion of each riser until it stops.
Step 7- Insert risers into hole in oor and
secure oor anges with appropriate screws/
bolts for your ooring type. (Hardware not
included)
Notes:
1. Faucet is not for use on concrete oors.
2. Please ensure all local plumbing codes are observed during installation
3. Water supply lines must be roughed in on 8” centers.
NOTE: When using the
U-SBRC support brace
it must be installed onto
faucet risers prior to
securing to oor