Instructions / Assembly

44
CONTROL BOX
©Ghost Controls 2017 | www.GhostControls.com
STEP 3. ROUTING THE OPERATOR CABLE AND BATTERY HARNESS INTO THE
CONTROL BOX
A. First route the battery harness cable thru the strain relief on the bottom of the control box and connect
the bullet connectors (red to red, black to black) to the control board harness. See below diagram.
B. Route the operator cable thru the same strain relief into the control box. We recommend feeding the
cable through PVC conduit. Follow the diagram below.
C. Connect the operator wires to the control board. See diagram above. Find the 1st operator screw terminal
on control board and insert the red, black, green and white wires into the matching terminals and tighten
each of the screws so that the wires do not come loose and fall out.
B