Instructions / Assembly
15
PLANNING
©GHOST CONTROLS 2017 | www.GhostControls.com
Gate Lock
Tube Gate Brackets
Push Button
Wired Vehicle Sensor
5 Button
Transmitter
(included)
3 Button
Transmitter
(optional)
Minium of 20 Feet
Control
Box
Solar Panel
Battery
Box Kit
Pedestrian
Gate
Wireless Keypad
Outdoor Mounting Pedestal
Proper planning of the automatic gate operator installation will enable a successful installation for almost anyone who has
general home improvement skills. You should consider the following:
1. SEPARATE PEDESTRIAN GATE IS REQUIRED!
2. Single or dual gate operation based on the size of your opening,
gate specifications, and operator system capacities.
A. Dual gate operations require trenching across the
driveway so that the power cable for the secondary
gate operator can be buried.
B. The power cable should always be enclosed in PVC
conduit for protection, including when buried across
the driveway in dual gate applications.
3. Swing direction of gate(s). The image (shown) indicates the
more common “Pull-To-Open” installation and the less
common “Push-To-Open” installation.
Gate Operator System View Looking
Straight Down from Above
PULL-TO-OPEN
Most Common
PUSH-TO-OPEN
Diagram also shows optional add-on
accessories available for your gate
opener system
INSTALLATION PLANNING
DTP1 KIT SITE PLANNING