Instructions / Assembly
29
PULLTOOPEN
©Ghost Controls 2019
PREPARING THE GATE SYSTEM CONTROLLER
The gate system control board provides one convenient place to make all of your system connections and to change any 
settings that you desire to personalize how your automatic gate opener system operates at your home or property. This main 
board (shown below) is located inside of the control box of your system and will be referred to in detail through the next few 
sections. Because this control box may be mounted within reach of children or potential vandals, we oer and recommend an 
operator lock security kit (AX2L) as an accessory to safely lock this box in the closed position to prevent tampering. NOTE: 
BEFORE PROCEEDING MAKE SURE THE ON/OFF SWITCH ON BOTTOM OF CONTROL BOX IS IN THE 
OFF POSITION
STEP 10.  Check the system DIP switch settings and verify in the correct positions as shown.
DIP Switch # OFF Position ON Position
1
 Factory Default:  
 Pull-To-Open
 Push-To-Open
2
 Warning Disabled  Factory Default: Warning Enabled
3
 Factory Default: 
 SafeForce
®
 Mode
 Monitored External Safety Devices Mode
4
 Factory Default: 
 Delay Open 2nd Arm
 Simultaneous Open










