Full Product Manual
31
PULLTOOPEN
©Ghost Controls
®
2023
G. Align and attach arm of operator to the secured front mount bracket, as shown below. Make sure all parts
installed during installation are tightened down.
STEP 15. IF ADDING A SECOND GATE OPERATOR REPEAT STEPS 1 14 SKIP STEPS 7 & 8
NOTE
For second operator you will need to dig a trench and use pvc conduit to put second operator power cables thru to connect
to the control box (2nd Operator Terminals) on the opposite side of the driveway.
STEP 16. DUAL GATE ONLY: INSTALL THE POSITIVE STOP PLATE.
Use the supplied Positive Stop Plate and hardware to install the Positive Stop Plate on the INSIDE OF THE FIRST
OPERATOR GATE as shown in the image below.
STEP 17. PROCEED TO PROGRAMMING THE CLOSED LIMIT SETTING.