Instructions / Assembly

47
CONTROL BOX
©Ghost Controls 2017 | www.GhostControls.com
STEP 5. ROUTING THE SECOND OPERATOR INTO THE CONTROL BOX
A. Route the second operator cable through the second strain relief of the control box. We recommend
feeding the cable through PVC conduit. Leave enough cable slack for operator to close the gate
completely . Follow the diagram below.
B. Connect the operator wires to the control board. See diagram above. Find the 2nd operator screw
terminal on control board and insert the red, black, green and white wires into the matching terminals
and tighten each of the screws so that the wires do not come loose and fall out.