Instructions / Assembly
46
CONTROL BOX
©Ghost Controls 2017 | www.GhostControls.com
STEP 3. ROUTING THE BATTERY HARNESS INTO THE CONTROL BOX
First route the battery harness cable thru the strain relief on the bottom of the control box and connect the bullet con-
nectors (red to red, black to black) to the control board harness. See below diagram.
STEP 4. ROUTING THE FIRST OPERATOR INTO THE CONTROL BOX
A. Route the first operator cable (one closest to the box) through the same strain relief into the control box.
We recommend feeding the cable through PVC conduit. Leave enough cable slack for operator to close
the gate completely. Follow the diagram below.
B. Connect the operator wires to the control board. See diagram above. Find the 1st operator screw terminal
on control board and insert the red, black, green and white wires into the matching terminals and tighten
each of the screws so that the wires do not come loose and fall out.