Instructions / Assembly
32
DEP2 Kit
Ghost Controls 2017 | www.GhostControls.com
STEP 10. REPEAT STEPS 2 THRU 9 FOR INSTALLING SECOND GATE OPERATOR
NOTE
Refer to image on page 17 for second operator. You will need to dig a trench and use pvc conduit to put second
operator power cables thru to connect to the control box on the opposite side of the driveway.
STEP 11. INSTALLING POSITIVE STOP PLATE
Determine location for Positive Stop Plate and mark the location of the (4) holes you need to drill on the gate.
Once holes are drilled use the supplied Positive Stop Plate and (4) bolts, (8) washers and (4) nuts to install the Positive
Stop Plate on the INSIDE of the first operator gate as shown in the image below.
STEP 12. TIGHTEN ALL PARTS
Make sure all parts installed during installation are tightened down.
STEP 13. GO TO INSTALLING THE CONTROL BOX CHAPTER, PAGE 45.