Instructions / Assembly

17
PLANNING
©Ghost Controls 2017 | www.GhostControls.com
Positive
Stop Plate
SECOND
Operator
power cables
TRENCH
SECOND
Operator
Control Box
Battery
Box Kit
Solar Panel
Wireless Keypad
Outdoor Mounting Pedestal
FIRST
Operator
Tube Gate
Brackets
5 Button
Transmitter
(optional)
3 Button
Transmitter
(included)
Pedestrian
Gate
Wired Vehicle Sensor
Minimum of 20 Feet
Push Button
Proper planning of the automatic gate operator installation will
enable a successful installation for almost anyone who has general
home improvement skills. You should consider the following:
1. SEPARATE PEDESTRIAN GATE IS REQUIRED!
2. Single or dual gate operation based on the size of your opening,
gate specifications, and operator system capacities.
A. Dual gate operations require trenching across the
driveway so that the power cable for the secondary
gate operator can be buried.
B. The power cable should always be enclosed in PVC
conduit for protection, including when buried across
the driveway in dual gate applications.
3. Swing direction of gate(s). The image (shown) indicates the more
common “Pull-to-Open” installation and the less common
“Push-to-Open” installation.
Gate Operator System View Looking Straight Down from Above
Diagram also shows optional add-on
accessories available for your gate
opener system
PULL-TO-OPEN
Most Common
PUSH-TO-OPEN
INSTALLATION PLANNING
SITE PLANNING SITE