assembly Instructions

IMPORTANT
Please read these instructions carefully before you start to assemble this shed.
Please carry out the steps in the order set out in these instructions.
Keep these instructions in a safe place for future reference.
ools & Equipment
Tool - (supplied)
4 rrrn
5132'
(these items not supplied)
J J
Mfg.
a
Caulk/
Silicon
Safety
IRThis
shed must be placed and fixed on a leveled surface to ensure its stability.
Make sure that screws and anchors are compatible with surface type.
Some parts have metal edges. Please be careful when handling components.
Always wear gloves, eye protection, and long sleeves when assembling or
performing any maintenance on your shed.
IRDo
not attempt assembly on days with strong winds or low temperatures. If using a
stepladder or power tools ensure that you follow the manufacturer's safety advice.
Do not stand on the roof.
Do not store hot items such as recently used grills, blowtorches etc. in the shed.
Heavy or sharp articles should not be leaned against the wall panels.
IRTo
prevent suffocation, do not allow children to play with packing materials.
IRShed
must be secured by drilling through floor panels holes locations and inserting
suitable screws into ground
Betore you start
Consult your local authorities for any building limitations or permits required to
construct this garden shed.
Complete site preparation before unpacking parts and beginning assembly.
It is highly recommended to be assisted by a second person in some steps.
Sort the parts and check against the contents parts list.
Please take safety precautions during assembly.
Durina
Assembly
When encountering the information icon, please refer to the relevant
assembly step for additional comments and assistance.
This icon indicates
that the installer should
be inside the product.
This icon indicates that
the installer should be
outside the product.
LAttention:
IR It is important to drill the screws at the top of the panel ridge and to
make sure that screws penetrate through the panel in order to have
maximum durability.
Make sure to position the panel's bottom ridge towards the shed floor
and that it is enclosing it.
Step 3: Place the first wall panel at the back of the shed, according to the stamped
serial number (part 7699).
Step 29: Please apply silicone (caulk) sealant at the connection between both
Aluminum profiles (diagram b), in order to prevent water from seeping in.
Step 39: Note that panels and profiles connected in the right direction as well as
the profiles holes placed correctly as illustrated.
Step 46: Anchor the shed on to a solid surface such as concrete or asphalt, use
suitable screws and plugs. (Screws and plugs are not supplied).
*Please note: Anchoring this product to the ground is essential to its stability and
rigidity. It is required to complete this stage in order for your warranty to be valid.
Do not tighten screws and nuts (411 & 412) until completion of assembly process.
These 2 icons indicate if screws'tightening is required or not.
,r4IVAID