User Manual
Table Of Contents
Geophysical Survey Systems, Inc. HandyScan
User's Guide
MN70-416
FCC NOTICES:
This device complies with part 15 of the FCC Rules:
Operation is subject to the following conditions:
1. This device many not cause harmful interference, and
2. This device must accept any interference received, Including interference that may
cause undesired operation
Warning: Changes or modifications to this unit not expressly approved by the party
responsible for compliance could void the user’s authority to operate the
equipment.
Operation of this device is restricted to law enforcement, fire and rescue officials,
scientific research institutes, commercial mining companies, and construction
companies. Operation by any other party is a violation of 47 U.S.C. § 301 and
could subject the operator to serious legal penalties.
Coordination Requirements.
(a) UWB imaging systems require coordination through the FCC before the equipment
may be used. The operator shall comply with any constraints on equipment usage resulting from
this coordination.
(b) The users of UWB imaging devices shall supply detailed operational areas to the
FCC Office of Engineering and Technology who shall coordinate this information with the Federal
Government through the National Telecommunications and Information Administration. The
information provided by the UWB operator shall include the name, address and other pertinent
contact information of the user, the desired geographical area of operation, and the FCC ID
number and other nomenclature of the UWB device. This material shall be submitted to the
following address:
Frequency Coordination Branch., OET
Federal Communications Commission
445 12
th
Street, SW
Washington, D.C. 20554
ATTN: UWB Coordination
(d) Users of authorized, coordinated UWB systems may transfer them to other qualified users
and to different locations upon coordination of change of ownership or location to the FCC and
coordination with existing authorized operations.
(e) The NTIA/FCC coordination report shall include any needed constraints that apply
to day-to-day operations. Such constraints could specify prohibited areas of operations or areas
located near authorized radio stations for which additional coordination is required before
operation of the UWB equipment. If additional local coordination is required, a local coordination
contact will be provided.
(f) The coordination of routine UWB operations shall not take longer than 15 business
days from the receipt of the coordination request by NTIA. Special temporary operations may be
handled with an expedited turn-around time when circumstances warrant. The operation of UWB
systems in emergency situations involving the safety of life or property may occur without
coordination provided a notification procedure, similar to that contained in CFR47 Section
2.405(a)-(e), is followed by the UWB equipment user.
NOTICE: Use of this device as a wall imaging system is prohibited by FCC regulations.