User Manual
Total Station Manual
140
In doing stakeout, center pile should be done first, then left and right pile.
Like point stakeout, there are three methods to do stakeout:
Method Definition Display
Polar
staketou
Ƹ
Hz
Direction difference:
Positve if measuring point
being right side of target
point.
Ƹ
Horizontal distance
difference: Positive if
measuring point far away
target point.
Ƹ
Height difference:
Positive if measuring
point above of target