Product Manual
Table Of Contents
- 1 Safety Directions
- 2 Description of the System
- 3 User Interface
- 4 Operation
- 5 Settings
- 6 Tools
- 7 Functions
- 8 Coding
- 9 MapView Interactive Display Feature
- 10 Applications - Getting Started
- 11 Applications
- 12 Data Management
- 13 Calibration
- 14 Care and Transport
- 15 Technical Data
- 15.1 Angle Measurement
- 15.2 Distance Measurement with Reflectors
- 15.3 Distancer, Measurements without Reflectors (Reflectorless mode)
- 15.4 Distance Measurement Reflector (Long Range)
- 15.5 Conformity to National Regulations
- 15.6 General Technical Data of the Product
- 15.7 Scale Correction
- 15.8 Reduction Formulas
- 16 Software Licence Agreement
- 17 Glossary
- Appendix A Menu Tree
- Appendix B Directory Structure
- Appendix C Connector PIN Layout
NEW
To create a new job.
Field Description
Job Name of an existing job to be used.
User Name of user, if entered.
Date Date the selected job was created.
Time Time the selected job was created.
Next step
•
Either, press OK to continue with the selected job.
•
Or, press NEW to open the NEW JOB screen and create a new job.
Once a job is set up, all subsequent recorded data will be stored in this job.
If no job was defined and an application was started, or if in Survey and a measurement was
recorded, then the system automatically creates a new job and names it "DEFAULT".
Press OK to confirm the job and return to the Pre-Settings screen.
10.4 Selecting the Station
All measurements and coordinate computations are referenced to the set station coordinates.
The station coordinates that are set must include:
•
at least grid coordinates (E, N), and
•
the station height, if required.
The coordinates can be entered manually or selected from the memory.
STn.X
STn.Y
Directions
X Easting
Y Northing
Z Height
Station coordinates
Stn.X Easting coordinate of station
Stn.Y Northing coordinate of station
Select Select Station in the Pre-settings screen.
SELECT JOB
Recorded data
Next step
Description
Access
Applications - Getting Started 59