Product Manual

Table Of Contents
Left up Hinge point Right up
Left up
Creates an upward plane extending
to the left of the defined hinge point.
Right
up
Creates an upward plane extending
to the right of the defined hinge
point.
Left
down
Creates a downward plane extending
to the left of the defined hinge point.
Right
down
Creates a downward plane extending
to the right of the defined hinge
point.
TSOX_120
Left down Right
down
Ratio of the slope. The unit for slope grade is defined in the GENERAL SETTINGS screen. Refer
to "5.1 General Settings".
Next step
Press Slope Setout to proceed to the Slope Setout screen.
Field Description
DefChain Defined chainage for stake out.
dChain Difference between the defined chainage and the measured
chainage.
dOffset Horizontal offset between the catch point of defined slope and
the measured position.
Cut Vertical offset between the catch point of the defined slope and
the measured position. A cut is above the slope, a fill is below
the slope.
Act.Slp Measured slope of the reflector position to the hinge point.
Offs.Hng Measured offset to the horizontal alignment including offset right
and offset left.
dH Hinge Height difference to the hinge point. The vertical offset between
the defined height at the current chainage, and the measured
position, including the defined height difference.
sDISTHng Slope distance from the measured point to the hinge point.
Z Height value of the measured point.
Slope type
Slope Grade
Slope setout
Applications 103