User guide
26
GeoDesy Kft. Telefon: 06-1-481-2050
H-1116 Budapest, Kondorfa str. 6-8. Fax.: 06-1-481-2049
E-mail: info@geodesy.hu
http://www.geodesy.hu
8.2 Alignment of the heads
Turn ON the equipment.
Turn the equipment to Manual Set Mode(status LED:green).(see 7.3 UserInterface)
By pressing the right-left buttons both at the same time then the AT system stops in
the middle position, the Position LEDs will turn twice confirming that. After that you
can start the alignment using the alignment unit.
Using the telescope and alingment unit.
Target Side B with the crosshair bulit in to the head on Side A.
Move to best receiving level using the screws of the alignment unit.(see 8.1 How to
use the alignment unit). The good alignment is when all 4 position LEDs are ON
and you have reciving level. If you have this at both sides then you have almost
ended the installation.
Please enable the Auto Tracking system. (status LED:yellow)