Installation Instructions

Error! Use the Home tab to apply 标题 1 to the text that you
want to appear here.
58 FA50 Operation Manual
6 Sample Test Process
The operator should check whether the instrument’s power cable is
safely and reliably plugged into the power port.
6.1 Startup
If there is externally connected device, like scanner, turn on its
power and make sure the device is ready, then turn on the power
switch at the rear of the analyzer, the analyzer starts initializing, as
shown in Fig. 6-1.
Fig. 6-1 Startup initializing